Emu Beach Foreshore Management Plan (FMP) (Closed)
Posted: 16/06/2021 Closing Date: 14/07/2021 11:00 PM
The City of Albany in conjunction with the community and key stakeholders have produced a draft Foreshore Management Plan (FMP) for the area of coast from the Albany Golf Club to Emu Point.
This document aims to integrate environmental and landscape management, along with coastal adaptation strategies, to guide future investment in land uses, facilities, structures and land management practices.
The City of Albany wants your feedback on the proposed recommendations for this area of coast.
In addition the consultants for the Emu Beach FMP have prepared a series of online presentations.
The slide have been chronologically ordered and will run in time with the narrations without the need to click between slides once opened:
01-Introduction & Site Context
02-Coastal Engineering
03-Landscape (Part 1)
04-Landscape (Part 2)
05-Implementation
For further information contact City of Albany Major Projects on : 6820 3000 or email: [email protected]